Recent projects

  • Waitangi Stream Remediation and Erosion Protection

    The Waitangi Stream is controlled by the Bay of Plenty Regional Council and is used to control levels in Lake Ōkāreka. In late 2017 flows were increased beyond the streams capacity causing major scouring of one stream section, putting houses above at risk and damaging the natural environment.

    The site was accessed via a private road which was owned by a number of concerned land owners...

    Read more
  • Omokoroa Stormwater Pond and Earth Dam

    Completed in 2019, the Omokoroa SW Pond 02 for Western Bay of Plenty District Council involved construction of a 9m high by 80m long stormwater detention dam and levelling 5 ha of subdivision lots as the dam fill. The site was large, sloping and involved conditioning various types of soils to enable placing and compacting engineered fill for the Dam embankment and the Classic Builders residential subdivision. Approx...

    Read more
  • Ohinemuri Suspension Bridge

    Built for the Department of Conservation in 2018, this bridge spans 70m across the Karangahake River and weighs a total of 16 tonnes. Made up of six 12 metre long segments, the bridge provided quite a challenge to the construction team.

    The bridge was built alongside the existing suspension bridge which accommodates thousands of visitors annually, working areas were tight, and access to the other side of the river was very restricted...

    Read more
  • Samoa Refurbishment of Samasoni, Fale Ole Fee and Alaoa

    MAP Projects workers installing piping

    MAP expertise in the Water and Hydro Projects saw us awarded the $9. 8M USD equivalent Hydro Rehabilitation project for Electric Power Company (Samoa) – Joint Venture with Pernix Group (49% MAP). MAP Provide all the key project management staff (with exception of Safety Officer), all the physical resources and employed the local work force...

    Read more