Recent projects

  • Ila Place Waste Water Treatment Tanks Upgrade

    This 2014 – 2015 Project for Tauranga City Council consisted of the supply and installation of three 2. 5m diameter by 29m fibreglass tanks, 240 m of sewer pipes and installation of eight concrete manholes, which showed MAPs temporary works design and sheetpile capabilities.

    • The work involved excavation and storage of some 2000m3 of material on the site...

    Read more
  • DOC National Trout Centre Sewer Upgrade

    This project in 2009 involved the installation of gravity sewer and pump station within the National Trout Centre Facility at Turangi. From the Pump Station we completed almost 2. 4km of Rising Main sewer back into Turangi

    • Physical works undertaken clearing and construction of a new site access, construction of flood protection bunds and excavations for storage chamber
    • Installed over 290 metres of 150mm sewer pipes to varying grades...

    Read more
  • Patea Dam Downstream Toe Repair

    This 3 month job in 2014 for TrustPower was to repair the downstream toe of the Dam that was damaged in a big rain event and consisted of cut and fill earthworks and borrowing and placing Riprap

    The downstream toe was “landlocked” by the overhead transmission lines and the powerhouse penstocks and required an innovative idea to lower a trolley down the face of the dam.

    The work method delivered a great project outcome safely.

    ...

    Read more
  • Ohakune Wastewater Treatment Plant Upgrade

    This project in 2007 was completed as the Major subcontractor to Heb Smithbridge, MAP Projects ( formerly Bema) provided Project Management and all plant and labour for river outlet and protection works, earthworks, retaining walls, concrete structures, filter media and gravel access roads.

    • ” Physical works undertaken in a native bush, with a water course through site, and difficult access. Implementation, management and monitoring under detailed site specific Erosion & Sediment control plan and detailed construction methodology resulted in considerably less native bush removal than initially anticipated...

    Read more